Work done
 

Work done problem 19


A boy uses a rope to pull an object of mass up a slope. The rope is parallel to the slope. The tension in the rope is constant and of value . The object moves a distance along the slope and rises through a height . How much work is done by the boy?










 

main author and content editor: Daniel Owoyomi